Media Cabinet Final Stages

Well, I am in the final stages of the media cabinet! Im pumped and can see the finish line. Over the weekend we finally had some amazing weather so I was able to spend a good deal of time working on the cabinet. I was able to rout the profile around the bottom of the cabinet and then glue the vertical partitions into place. Next, I was able to dry fit all of the back panels; for these I just used ship lapped panels that will free float. One thing I did was to leave a good bit of space in the center section, at the top, to allow plenty of air flow and cable routing. I also took a page out of Marc Spagnuolos book and his media cabinet build where he inset the middle back panel a couple of inches so you could put the power strip there and all the cable routing would fit in there and be hidden and allow you to put the cabinet further against the wall; great idea!

After the vertical partitions were dried, I got to work final fitting all the shelves and got those lightly glued into place. Lastly, I put the center doors back in and did the final fitting of those to make sure I had enough clearance all the way around each door. Then it was time to do any glue removal and finish sanding to prepare for the finish. One thing I like to do is to wait a few hours for the dust to settle, literally, then wipe the whole piece down with mineral spirits. This does a couple of things. First, it gets all the saw dust off of the piece. Next, it allows you to see any blemishes or glue spots that you may have missed and allows you to touch those up before putting on the finish.

For the finish I am applying a couple coats of Watco Danish Oil. Once that is good and dry (after a few days) I am going to spray several coats of shellac on it. This may be about another week or so away as the weather is supposed to turn pretty cold again for the next several days.

A couple construction Items I still need to do are to scrape and sand the top, rout the profile on it and apply the finish. I also need to feet on the base as well, but that will be last. Nearing the end!

Be Safe!
Read More..

The basics of cabinet making Part 1

I am custom making a set of 6 storage cabinets, and I thought this would be a good opportunity to show some basics of cabinet making, my way. 4 of the 6 cabinets are identical and are 84" high, with 4 shelves each. The other two cabinets are smaller to fit under a window.

After picking up the materials, Ive started cutting the side case work for the tall cabinets. After cutting to depth and height, I am going to make all dado and rabbit cuts before assembling.

If you make your own cabinets, a good rule of thumb on taller cabinets is to always make one of the shelves stationary. This will help tie in and stabilize the unit itself. Ive determined the location of the stationary shelf and have made the appropriate dado cut, and have also dadoed for the bottom shelf. In addition, Ive cut out for the toe kick areas, and have also put a rabbit groove on the backside to accommodate the back panel.

Tip: Whenever you have several of the same cuts (in this case, I have 16 of the same dado cuts to make), always try to use a jig, or some similar setup to make these cuts. Doing so results in level shelves, squared casing, and more! Even the easiest jig can make repetitive work go quicker, and having like-results will be well worth the setup time. Below are some examples of how I use jigs or repetition setups to make all the same cuts go smoothly and quickly. In (roughly) one day, I have all the side casings cut, dadoed, rabbited, and ready to go, including the rails and main shelves for each unit! If you take the time, the results will be well worth it!



Setting up guides for the router, so I can easily make the dados.


Use positive stops to cut all rails to the same lengths.